Summit Valley Equipment &
Engineering

724 West 500 South Suite 900
West Bountiful, Utah 84087
engr@summit-valley.com

 

Home Equipment Engineering Projects/Clients Whats New

Client list
SVEE Installation Map
Contact SVEE

Summit Valley Significant Engineering and Equipment projects

January 2008

ALLIED NEVADA GOLD

HYCROFT REFINERY. –NEVADA, USA

August 2007

MINERA TRITON

MANANTIAL ESPEJO- 375 m3/hr. ARGENTINA

August 2007

KENNECOTT RAWHIDE

ADR PLANT EXPANSION. NEVADA, USA

July 2007

PARACATU

ELECTROWINNING PROJECT. BRAZIL

June 2007

AGNICO EAGLE

KITTILA PROJECT – 3 TONNE ADR PLANT. FINLAND

April 2007

MINERA PENASQUITO

Hg RETORTS – (2) 40MR1E. MEXICO

March 2007

CENTERRA GOLD

CIC COLUMNS – 2 TONNE. MONGOLIA

March 2007

AUSENCO – MOROBE CONSOLIDATED

MERRILL-CROWE EQUIPMENT- 143m3/hr. PNG

March 2007

ETI SILVER

MERRILL-CROWE PLANT – 800 m3/hr. TURKEY

November-2006

MINERA MERIDIAN

EL PENON PROJECT - 40MR1E

October-2006

EMPRESSA MINERA MANQUIRI

SAN BARTOLOME SILVER PROJECT – 750 m3/hr. ARGENTINA

September-2006

PETAQUILLA MINERALS

2 TON ADR-PANAMA

August-2006

GEKKO SYSTEMS

SAN JOSE PROJECT-E/W PACKAGE

June-2006

ENOR SPA (ALGIERS)

2 TONNE PLANT

June-2006

METSO MINERALS 

GORUBSO MINE-BULGARIA-1 TON ADR PLANT

September-2005

MINERA CORNER BAY

ALAMOS DORADO PROJECT-125 CUBIC FT E-CELLS

September-2005

NINGXIA PACIFIC MINING CO.

JINSHAN PROJECT - 2 TON ADR PLANT

June-2005

BARRICK

SVEE SPLIT-ZADRA STRIP SYSTEM ENGINEERING

June-2005

MINERA CORNER BAY-M3 ENGINEERING

ALAMOS DORADO PROJECT-ENGINEERING

April-2005

MINERA CORNER BAY

LA COLORADA- PAN AMERICAN SILVER

February-2005

TUPRAG METAL

KISLADAG PROJECT

October-2004

BARRICK-AUSTRALIA, LTD.

COWAL LAKE

July-2004

TECK POGO

POGO MINE-STRIP SYSTEM

July-2004

MA'ADEN

CARBON & GOLD REF. EQUIP.

June-2004

MONT. EXPLOR. DE GUATEMALA

MARLIN PROJECT

May-2004

TECK POGO

POGO MINE-E CELLS & RECTIFIERS

November-2004

EL DORADO GOLD

KISLADAG PROJECT

October-2004

AMEC-NEWMONT PHOENIX

E-Cells

August-2004

MA'ADEN

CAR. WASH, ELUT., EW REFINERY & KILN

August-2004

SNC LAVALIN-LAS CRISTINAS

EW CELLS & RECTIFIERS

July-2004

AMEC-TECK POGO

Strip System

June-2004

FLUOR CANADA-MARLIN PROJECT

750 m3 /HR M-C PLANT/REFINERY

April-2004

ST. ANDREWS GOLDFIELDS LTD.

STRIP SYSTEM & KILN

October-2003

PROMOTORA MINERA DE GUAYANA S.A.

CHOCO CARBON EQ. ENG

August-2003

GLAMIS-MINAS DE LA ALTA PIMERIA S.A.

EL SAUZAL

December-2002

ROSEBEL GOLD MINES N.V.

CARBON HANDLING CIR./GOLD ROOM

October-2002

ROUND MOUNTAIN GOLD CORP

CARBON COLUMNS

February-2002

GEOTECH SERVICE/TEINA FIN.

MC 300 M3/HR PLANT

April-2003

 

Engineering for a mercury solidification system for a Peruvian gold mining company is on going.

January-2003

 

Another 300 m3 Merrill-Crowe plant was shipped to Russia.

October-2002

 

Summit Valley produced a set of carbon columns for a client in Nevada capable of handling a flowrate of 7500 gpm. These are possibly the largest absorption columns and were shipped completely assembled.

September-2002

 

A 75 cubic foot electrowinning cell was shipped to Placer Dome in Canada.

May-2002

 

Summit Valley was involved in producing a feasibility study for Trans Siberian Gold for their project in the Kamchutka Peninsula in Russia. This was a small gold plant involving crushing, grinding, leaching, adsorption, stripping, electrowinning, and refining.

May-2002

 

An electrowinning cell and rectifier was supplied to Cripple Creek and Victor Gold Mining Co. for use in their expanded operation.

May-2002

 

An electrolyte heater and heat exchanger was supplied to Phelps Dodge for use in their Bagdad operation.

March-2002

 

A skid mounted solution heater complete with heat exchangers was shipped to Echo Bay McCoy Mine. This package was installed into an existing stripping system, and was shipped pre-piped and wired.

February-2002

 

A 300 m3 Merrill-Crowe plant was shipped at Geotech Service located in Russia.

January-2002

 

Summit Valley engineered an expansion study for Heclas La Camorra operation in Venezuela. This study involved crushing, milling, loading, CIP, stripping and electrowinning, and mercury retorting.

January-2002

 

A 2 ton ADR plant cost study was completed for Glamis gold.

December-2001

 

Summit Valley announces the delivery of another mercury retort system for recycling of fluorescent lamps to Fluorescent Lamp Recyclers located in Ayr, Ontario. This retort has a capacity of 12 cubic feet.

December-2001

 

Summit Valley has been involved in water treatment system engineering involving radium, ammonium, arsenic, and removal.

 

Contact SVEE Organization Photos Spare Parts

Revised February 16, 2007

 

©2008 SVEE